Contractors sign off fewer hours than your workers put in more often than anyone notices. Rostiko puts their sheet next to your attendance, day by day, so every difference is caught before you invoice.

A supply company is paid for the hours a contractor signs, not the hours its workers spent on site. Site engineers often round down, miss a Friday or forget overtime, and the paper sheet arrives days after month end. Checking it by eye against your own records takes hours, so most differences are never found. Rostiko lines up both figures for every worker and day, so you see exactly where the contractor's sheet is short and can raise it before the invoice goes out.
Contractor timesheets in four steps, inside the same system as everything else
Mark each day for every site, or let workers check in from their phone.
Type their hours from the signed timesheet and upload the photo.
Days where the two figures disagree turn red, with a count per worker.
Bill on the contractor's totals or your attendance, then create the invoice.
Built for how UAE manpower supply companies work
Contractor hours and your attendance sit in two rows for each worker, so a gap is impossible to miss.
Upload the timesheet photo to the month, so the proof is there if a figure is disputed.
Approve the contractor's totals or your own attendance, worker by worker, with a note.
Each site's sheet has a due date, and overdue ones stand out in the list.
The day turns red. You decide which figure to bill and can add a note explaining why.
Yes. Workers can check in from their phone portal, and the location is saved if their phone allows it.
Yes. Overtime hours are recorded in attendance and carried into billing and payroll.
Yes. Each site has its own monthly timesheet, because each one is usually signed by a different site engineer.
A 30-minute walkthrough with sample data, or start your free trial today.